Event Date |
Tach Hours |
Type Event |
Wheels Tires |
Brakes | Lights | ELT | Battery | Electrical System |
Flight Controls |
Canopy | Miscellaneous Repair |
A/D SB |
3/20/1979 | 1.9 | Production test flight | ||||||||||
3/15-/79 | ELT Armed | |||||||||||
3/15-/79 | Transponder Certified | |||||||||||
4/3/1979 | 1.9 | Airworthiness Certificate Issued | ||||||||||
6/16/1980 | 8.5 | annual | ||||||||||
8/13/1980 | 54.8 | service | replace T&B | |||||||||
9/22/1980 | 104.1 | 100 hour | repack bearings | battery | service | check | lube | |||||
12/5/1980 | 202.3 | 100 hour | repack bearings | battery | fuel filter | |||||||
12/16/1980 | 217.3 | AD | 80-25-07 (N/A) | |||||||||
3/9/1981 | 284.3 | replace L main/tube | ||||||||||
3/25/1981 | ? | Transponder Certified | ||||||||||
3/26/1981 | 301.8 | 100 hour | repack
bearings replace R main |
check | check | check | check | lube | lower cowling aft mounting bracket | |||
7/2/1981 | 382.0 | 100 hour/annual | repack bearings | check | check | check alt | replace
vacuum filter check muffler |
|||||
8/26/1981 | 432.0 | ? inspection | check | check | service | |||||||
10/5/1981 | 476.1 | service | replace | |||||||||
10/16/1981 | 480.9 | 100 hour | repack bearings | check | check | lube | ||||||
12/3/1981 | 532.1 | 50 hour | service | check | check | charge | ||||||
2/5/1982 | 579.1 | 100 hour | repack
bearings replace mains |
serviced | check | battery | check | lube | ||||
7/7/1982 | 727.7 | 100 hour/annual | repack
bearings bellville washers |
check | check | lube | ||||||
12/1/2002 | 833.0 | 100 hour | repack
bearings replace mains |
rebuild master cylinders | battery | lube | ||||||
3/17/1983 | Transponder & altimeter/static certified | |||||||||||
5/5/1983 | 932.0 | 100 hour/annual | repack bearings | replace linings | check | check | lube | |||||
8/1/1983 | 982.0 | annual | repack
bearings bellville washers |
lube | ||||||||
11/1/1983 | 1,036.2 | service | R brake | |||||||||
8/31/1984 | 1,157.0 | annual | replace
L lining replace mains |
79-22-4 81-24-3 |
||||||||
9/1/1985 | 1,246.2 | annual | ||||||||||
10/1/1986 | 1,306.4 | 100 hour/annual | repack
bearings replace linings |
check | replace carb filter | 79-22-4 81-24-3 |
||||||
1/2/1988 | 1,369.7 | 100 hour/annual | repack
bearings repair main fairings |
replace
O-ring replace linings |
battery | lube | 79-22-4 81-24-3 |
|||||
4/11/1989 | ferry approval | |||||||||||
8/10/1988 | Peterson
STC 5A1965CE |
|||||||||||
4/27/1989 | 1,461.3 | annual | repack bearings | replace landing light | ||||||||
11/26/1989 | service | replace R lining | ||||||||||
3/27/1990 | 1,499.8 | 100 hour/annual | repack bearings | battery | replace
vacuum filter pitot heat replace inboard fuel drain o-rings replace outboard fuel drains repair L?H wheel fairing install stainless screws in cowlings repair R/H aileron stop |
79-22-04 81-24-03 89-18-08 SB 176 |
||||||
3/20/1991 | 1,559.0 | 100 hour/annual | repack
bearings replace nose tire |
repair
tail nav replace wingtip lenses |
battery | lube | seals | |||||
4/15/1991 | transponder and encoder certification | |||||||||||
6/19/1992 | 1,572.5 | 100 hour | replace mains | replace rotors and linings | repair rudder cap/beacon | lube | remove T/C, send to mfr for overhaul, reinstall | 79-22-04 81-24-03 |
||||
6/24/1992 | 1,572.5 | annual | ||||||||||
7/9/1993 | 1,592.5 | 100 hour/annual | replace tail nav | battery | lube | replace vacuum filter | 79-22-04 81-24-03 |
|||||
9/20/1994 | 1,617.3 | 100 hour | lube | AI/DG
overhaul replace vacuum filter replace L/H strobe P/S |
79-22-04 81-24-03 SB 185 |
|||||||
9/29/1994 | 1,617.3 | annual | ||||||||||
1/6/1995 | transponder and encoder certification | |||||||||||
1/20/1995 | 1,620.0 | service | replaced beacon & P/S | |||||||||
10/9/1995 | 1,644.9 | 100 hour | battery | remove
bird's nest from stabilizer repaired right fuel sender leak |
79-22-04 81-24-03 |
|||||||
10/25/1996 | 1,690.0 | annual | remove
corrosion/paint lower engine mount repair lower cowling replace carburetor |
|||||||||
1/16/1998 | 1,708.0 | ferry approval | ||||||||||
1/21/1998 | 1,708.3 | repack bearings | service | lube | c/s seal? | 81-24-03 SB 187 |
||||||
1/30/1998 | transponder certification | |||||||||||
1/15/1999 | 1,738.0 | transponder certification after repair | ||||||||||
1/31/1999 | 1,738.0 | inspection | 98-25-10 | |||||||||
2/15/1999 | 1,739.0 | annual | replace R lining | replace
R/H fuel sender gasket replace all fuel drain valves rudder return springs fuel pump gasket and magnet |
||||||||
9/12/1999 | transponder repair | |||||||||||
4/20/2001 | 1,788.7 | annual | replace
nose wheel bearings & races repack bearings |
replace R nav lamp | replace G-25 | replace
L/R outboard aileron bearings replaced engine baffling replaced heater shroud |
79-22-04 |
|||||
5/17/2002 | 1,809.9 | annual | repack bearings | service | battery | lube | replace all fuel drain valves | |||||
3/8/2003 | 1,812.6 | transponder repair | ||||||||||
11/6/2003 | 1,812.7 | annual | service | lube | reseal R fuel tank | |||||||
2/1/2005 | 1,826.0 | annual | replace
linings replace cylinders |
install Ameriking AK-450 ELT | replace
primer o-rings install JPI FS-450 |
|||||||
2/1/2005 | 1,837.0 | service | replace worn interior | |||||||||
6/1/2005 | 1,839.0 | service | replace G-25 | replaced compass with Precision PAI-700 | ||||||||
10/10/2005 | 1,849.0 | |||||||||||
11/11/2005 | 1,850.6 | transponder certification | ||||||||||
3/7/2006 | 1853.6 | annual | service fluid | checked | serviced | lube | cleaned gascolator |